Schedule of works for future trunk infrastructure
The Brisbane Priority Infrastructure Plan Part 4 includes a schedule of works.
Download and review the schedule of works tables below:
- WS1 - Water supply network (Excel - 76kb)
- S1 - Sewerage network (Excel - 81kb)
- SW1 - Stormwater network (Excel - 171kb)
- T1 - Transport network local controlled roads network (Excel - 33kb)
- T2 - Transport network state controlled roads network (Excel - 60kb)
- T3 - Transport network (pathways network) (Excel - 38kb)
- T4 - Transport network (public transport (ferry terminals) network) (Excel - 17kb)
- T5 - Transport network (public transport (bus stops) network) (Excel - 18kb)
- CP1 - Community purposes network (public parks network) (Excel - 130kb)
- CP2 - Community purposes network (land for community facilities network) (Excel - 33kb)
Excel viewer
You need to have Microsoft Excel or Microsoft Excel Viewer installed on your computer to view or print this document.






