Bikeway closures and detours
Find out about temporary closures and detours to Brisbane bike paths before you plan your ride.
Current and scheduled bikeway closures
Check the bikeway and shared path closures and detours before riding in Brisbane.
The following closures are long-term closures on major bikeways across the city.
We're restoring pathways and surrounding infrastructure across Brisbane so residents can keep walking, riding and enjoying their local area safely.
Looking after the paths people use every day is an important part of keeping Brisbane moving and maintaining our great outdoor lifestyle.
These works are being jointly funded by the Australian and Queensland governments through the Disaster Recovery Funding Arrangements (DRFA).
Some fencing may be in place along sections of closed pathway to help keep people safe while work is being completed. Follow signs and take care when walking or riding nearby.
Thanks for your patience while we complete these works to keep Brisbane's pathway safe and accessible for everyone to walk, ride and enjoy.
Central closures
The North Quay lift, adjacent stairs and ramp will be closed during lift upgrade works, with a temporary detour in place.
The detour will guide pedestrians and cyclists to alternative lift, stair and ramp access. Works will take place from mid-August until early November 2026.
Please follow the direction of signage.
North closures
Sections of bikeway and footpath along the Kedron Brook Bikeway have been impacted by erosion.
The Kedron Brook Bikeway remains functional with some minor diversions and temporary mesh fencing in place around the eroded footpath until rectification work is completed.
The bikeway will be closed at Balun Park, Newmarket from 7 to 10 September. These works will improve and smooth the pathway surface for users. Signage is onsite and bike user groups have been advised.
The bikeway will be closed at Shaw Estate Park, Wavell Heights from 9 to 11 September. These works will improve and smooth the pathway surface for users. Signage is onsite and bike user groups have been advised.
South closures
The central pathway in Les Atkinson Park, connecting to Wolff Street, is closed for community safety following erosion from significant rain events. Council is investigating this location to confirm next steps for local connectivity.
Please use the suggested detour route around the outside of the park, along Beenleigh Road and Stones Road or Wolff Street (behind Jim Murdoch Oval) when travelling to and from the train station.
East closures
Council is upgrading a section of the Bulimba Creek bikeway within Preston Road Park to smooth the existing path.
Works will take place from 31 August to 18 September 2026, stop for the school holidays and recommence from 13 October to 19 November 2026 (weather permitting).
There will be a section of bikeway closed in this area. Signage will be in place around the work area.
West closures
Repair works are planned on the bridge near Creekside Street Park in Kenmore Hills from 28 September until mid-December 2026.
For safety reasons, the bridge will be completely closed during the works. Plan ahead and follow detour signs and the direction of traffic controllers.
For more information, contact Council's project team by:
- phone on 07 3178 5413
- email.
Request a bikeway closure
You can request to partially or fully close a bikeway in Brisbane for maintenance, major construction or to hold an event.
Complete the online application to temporarily close an off-road shared pathway/bikeway.