Bridgeman and Beckett Road Corridor Upgrade project

The Bridgeman Road and Beckett Road corridor upgrade at Bridgeman Downs is part of Lord Mayor’s Graham Quirk’s Road Action Program. The program delivers traffic congestion reduction, increased safety and improved access across Brisbane’s road network.

Summary

Address Bridgeman Road and Beckett Road, Bridgeman Downs (Linkfield Road to Saturn Crescent)
Ward Bracken Ridge and McDowall
Project outcome Reduce traffic congestion, improve safety and meet future demands as the area's population continues to grow
Latest update Stage one was completed in April 2011
Stage two and three was completed on 20 December 2011

About the project

Council is pleased to announce the completion of the Bridgeman Road and Beckett Road corridor upgrade project. The project was delivered in three stages:

  • stage one – Bridgeman Road and Carseldine Road between Linkfield Road and Beams Road (completed April 2011)
  • stage two – Bridgeman Road between Beams Road and Graham Road (completed on 20 December 2011)
  • stage three – Beckett Road between Graham Road and Saturn Crescent/Casuarina Street (completed on 20 December 2011)

The project involved upgrading each stage to a four-lane arterial standard roadway with centre median and aims to reduce traffic congestion, improve safety and meet future demands as the area’s population continues to grow.

Stage one

Stage one involved:

  • construction of a new four lane road with centre median between Linkfield Road and Beams Road
  • installation of on-road bike lanes and pedestrian footpaths
  • installation of traffic signals at Beams and Bridgeman Roads, Bridgeman and Roghan Roads, and Roghan and Carseldine Roads intersections
  • installation of u-turn facilities on Bridgeman Road, just north of Beams Road and at Bridgeman and Roghan Road (west) intersection

Stage two

Stage two involved:

  • widening the current road to four lanes with centre median between Beams Road and Graham Road
  • installation of on-road bike lanes and pedestrian footpaths
  • installation of u-turn facilities along Bridgeman Road (north of Graham Road and south of Beams Road)
  • installation of traffic signals at the Beams Road and Graham Road intersection

Stage three

Stage three involved:

  • widening the current road to four lanes with centre median strip between Graham Road and Saturn Crescent/Casuarina Street
  • installation of on-road bicycle lanes and pedestrian footpaths
  • installing traffic signals at the Darien Street and Beckett Road intersection
  • installing u-turn facilities at Albany Creek and Beckett Roads and Beckett Road and Darien Street intersections
  • upgrading the existing Albany Creek Road and Beckett Road intersection

Benefits

  • improved safety for motorists and pedestrians
  • improved traffic flows
  • concrete footpaths
  • improved street lighting
  • landscaping using native species
  • improvements to drainage
  • new culvert crossings

Council would like to thank all local residents and motorists for their patience during the construction of this important project.

More information

If you would like to provide comments, ask questions or find out more about the Bridgeman Road and Beckett Road Corridor Upgrade Project, you can:

  • phone the project team on 1800 550 712
  • phone Council on 07 3403 8888
  • email the project team
  • write to:

    Brisbane Road and Beckett Road Corridor Upgrade Project
    Transport Infrastructure
    Brisbane City Council
    GPO Box 1434
    Brisbane Qld 4001