Brisbane infrastructure charges | Brisbane City Council

Brisbane infrastructure charges

The infrastructure charges in the tables below are identified in the Brisbane Infrastructure Charges Resolution (No. 7) 2018, which applies to development approvals given on and after 2 July 2018.

Note that transport, public parks and land for community facilities and stormwater network charges are levied by Council, while water supply and sewerage network charges are levied separately by Queensland Urban Utilities.

Adopted charges for reconfiguring a lot

Demand unit Sewerage network charge Water supply network charge Transport, public parks and land for community facilities and stormwater networks total charge Total adopted charge
Lot $9,492.52 $4,675.43 $14,167.95 $28,335.90

Adopted charges for material change of use or building work for residential development

Use heading (Schedule 16 Planning Regulation 2017)

Demand unit Sewerage network charge (per demand unit) Water supply network charge (per demand unit) Transport, public parks and land for community facilities and stormwater networks total charge (per demand unit) Total adopted charge (per demand unit)
Residential (e.g. Dwelling house) 1 or 2 bedroom dwelling $6,780.38 $3,339.59 $10,119.98 $20,239.95
3 or more bedroom dwelling $9,492.52 $4,675.43 $14,167.95 $28,335.90
Accommodation (short-term) (e.g. Short-term accommodation) Suite with 1 or 2 bedrooms $3,390.19 $1,669.79 $4,047.98 $9,107.96
Suite with 3 or more bedrooms $4,742.13 $2,337.71 $6,071.97 $13,151.81
Accommodation (long term) (e.g. Retirement facility) Suite with 1 or 2 bedrooms $6,780.37 $3,339.58 $8,095.96 $18,215.91
Suite with 3 or more bedrooms $9,492.50 $4,675.42 $12,143.94 $26,311.86

Adopted charges for material change of use or building work for non-residential development

Use heading (Schedule 16 Planning Regulation 2017) Sewerage network charge (per m² of Gross Floor Area (GFA)) Water supply network charge (per m² of GFA) Transport and public parks and land for community facilities networks total charge (per m² of GFA) Total charge (per m² of GFA) excluding stormwater charge
Places of assembly (e.g. Club) $24.29 $12.14 $34.41 $70.85
Commercial (bulk goods) (e.g. Garden centre) $24.29 $12.14 $105.22 $141.65
Commercial (office) (e.g. Office) $24.29 $12.14 $105.22 $141.55
Commercial (retail) (e.g. Shop) $24.29 $12.14 $145.72 $182.15
Educational facility (e.g. Childcare centre) $24.29 $12.14 $105.22 $141.65
Entertainment (e.g. Hotel) $40.48 $20.24 $141.68 $202.40
Indoor sport and recreation (e.g. non-court areas) $40.48 $20.24 $141.68 $202.40
Indoor sport and recreation $3.03 $2.02 $15.15 $20.20
Industry (e.g. Low impact industry) $24.29 $12.14 $14.16 $50.60
High impact industry $27.33 $13.16 $30.36 $70.85
Low impact rural        $0
High impact rural $7.07 $3.03 $10.10 $20.20
Essential services (e.g. Veterinary services) $24.29 $12.14 $105.22 $141.65
Minor uses       $0

All non-residential development types (n/a to low or high impact rural)

Stormwater network Per impervious m²
Adopted charge for stormwater network $10.10

 

02 July 2018