Draft Local Government Infrastructure Plan (LGIP) 2016-2026

Brisbane City Council is planning and delivering congestion-busting roads, better ways to get from here to there, parks and other infrastructure to keep Brisbane vibrant and liveable as it continues to grow.

Our city is evolving within one of the fastest growing regions in Australia and it’s important to make sure that as our city grows we maintain our high standard of infrastructure, delivered where and when it is needed and for the best value for money.

To make this happen, Brisbane City Plan 2014 (City Plan) is being amended to ensure development continues to be well-supported by new infrastructure into the future. Council is developing a Local Government Infrastructure Plan (LGIP) together with a City Plan major amendment for long term infrastructure. These plans represent more than 20 years of infrastructure delivery and include around 1000 projects worth $2 billion for stormwater, transport, parks and land for community facilities in the next 10 years alone.

Download the:

The draft LGIP was developed using input from the community and covers the following infrastructure networks:

  1. stormwater network (e.g. pipes and water quality treatment devices)
  2. transport network (e.g. roads, pathways, ferry terminals and bus stops)
  3. public parks and land for community facilities network.

As of 1 July 2014, Queensland Urban Utilities assumed responsibility for planning and delivering the water supply and sewerage network.  

The draft LGIP will replace the current LGIP (previously known as Priority Infrastructure Plan (PIP)) in Brisbane City Plan 2014 (City Plan), and adopts a 10 year planning horizon (2016-2026) to align with Council’s Asset management plan and statutory financial sustainability requirements.

To provide continued clarity about Brisbane’s long term infrastructure planning beyond 2026, Council is also proposing a City Plan major amendment for long term infrastructure to support longer term growth.

Proposed amendments

The draft LGIP was available for public consultation from 12 June 2017 to 21 July 2017. Council considered all properly made submissions during that time and made amendments where appropriate. These changes and a report on submissions have been endorsed by Council and sent to the Queensland Government for final review. The package of amendments will be formally adopted and included in City Plan in mid-2018.

Download the:

The following table lists the proposed section amendments and a copy of the revised draft. Where the sections have been amended following community consultation, both the proposed and revised documents are provided in the table. To view the current (original) version of the documents see the ePlan.

Download the:

Part/Schedule Section/sub-section Public Consultation Document  Revised Draft Document
Part 4

Part 4.1 Preliminary

Part 4.2 Planning assumptions

Part 4.3 Priority infrastructure area

4.4 Desired standards of service

4.5 Plans for trunk infrastructure

Part 4 (Word - 160kb)

No change
Schedule 3

SC3.1.6-SC3.1.12

SC3.2 Schedules of works

SC3.3 Local government infrastructure plan maps

Schedule 3 (Word - 105kb) Schedule 3 (Word - 59kb)
  SC3.1.1 - Existing and projected population  SC3.1.1 - Existing and projected population (Excel - 40kb) No change
  SC3.1.2 - Existing and projected employees SC3.1.2 - Existing and projected employees (Excel - 57kb) No change
  SC3.1.3 - Planned density and demand generation rate for a trunk infrastructure network  SC3.1.3 - Planned density and demand generation rate for a trunk infrastructure network (Excel - 59kb) SC3.1.3 - Planned density and demand generation rate for a trunk infrastructure network (Excel - 47kb)
  SC3.1.4 - Existing and projected residential dwellings  SC3.1.4 - Existing and projected residential dwellings (Excel - 39kb) No change
  SC3.1.5 - Existing and projected non-residential floor space SC3.1.5 - Existing and projected non-residential floor space (Excel - 55kb) No change
  SC3.2 Schedule of Works Stormwater Stormwater (Excel - 62kb) Stormwater (Excel - 33kb)
  SC3.2 Schedule of Works Ferry Terminals  Ferry Terminals (Excel - 23kb) Ferry Terminals (Excel - 23kb)
  SC3.2 Schedule of Works Road Road (Excel - 997kb) Road (Excel - 937kb)
  SC3.2 Schedule of Works Pathway Pathway (Excel - 85kb) Pathway (Excel - 84kb)
  SC3.2 Schedule of Works Public Parks Public Parks (Excel - 68kb) Public Parks (Excel - 21kb)
  SC3.2 Schedule of Works Land for Community Facilities Land for Community Facilities (Excel - 46kb) Land for Community Facilities (Excel - 46kb)
  SC3.4 LGIP Maps LGIP Maps (PDF - 7.05Mb) LGIP Maps (PDF - 10.3Mb)
 

SC3.4 Plans for Trunk Infrastructure

Active and public transport network

Active and public transport network maps (PDF – 32.4Mb) Active and public transport network maps (PDF – 32.4Mb)
 

SC3.4 Plans for Trunk Infrastructure

Road Network

Road Network maps (PDF – 32.3Mb) Road Network maps (PDF – 32.3Mb)
 

SC3.4 Plans for Trunk Infrastructure

Parks and Land for Community Facilities Network

Parks and Land for Community Facilities Network maps (PDF – 34.7Mb) Parks and Land for Community Facilities Network maps (PDF – 34.7Mb)
 

SC3.4 Plans for Trunk Infrastructure

Stormwater Network

Stormwater Network maps (PDF – 34.5Mb) Stormwater Network maps (PDF – 34.5Mb)
Schedule of Works Model Stormwater Stormwater (Excel - 63kb) Stormwater (Excel – 7.6Mb)
  Ferry Terminals Ferry Terminals (Excel - 24kb) Ferry Terminals (Excel - 419.7kb)
  Road Road (Excel - 997kb) Road (Excel - 1.2Mb)
  Pathway Pathway (Excel - 85kb) Pathway (Excel - 5.4Mb)
  Public Parks Public Parks (Excel - 69kb) Public Parks (Excel - 2.6Mb)
  Land for Community Facilities Land for Community Facilities (Excel - 46kb) No Change
  Revenue and Cash Flows Revenue and Cash Flows (Excel - 85kb) Revenue and Cash Flows (Excel - 80.6kb)
Extrinsic Material

Stormwater network

Stormwater Extrinsic Material (Word - 120kb) No Change
    Attachment 5.2 - Stormwater Extrinsic Material Schedule of Works (Excel - 79kb) Attachment 5.2 - Stormwater Extrinsic Material Schedule of Works (Excel - 47.9kb)
  Transport network Transport Extrinsic Material (Word - 120kb) Transport Extrinsic Material (Word - 92.8kb)
    Attachment 5.4 - Land value estimates for Brisbane City Council Local Government Infrastructure Plan (Word - 1.60Mb) No Change
    Attachment 5.5 - Extrinsic Material Schedule of Works - Road (Excel - 1.02Mb) Attachment 5.5 - Extrinsic Material Schedule of Works - Road (Excel - 59.1kb)
    Attachment 5.5 - Extrinsic Material Schedule of Works - Pathways (Excel - 91kb) No Change
    Attachment 5.5 - Extrinsic Material Schedule of Works - Ferry terminals (Excel - 24kb) No Change
  Public Parks & Land for Community Facilities network Public Parks & Land for Community Facilities Extrinsic Material (Word - 11.52Mb) No change
    Attachment 5.1 - Extrinsic Material Schedule of Works - Public Parks (Excel - 67kb) Attachment 5.1 - Extrinsic Material Schedule of Works - Public Parks (Excel - 33kb)
    Attachment 5.2 - Extrinsic Material Schedule of Works - Land for Community Facilities (Excel - 46kb) Attachment 5.2 - Extrinsic Material Schedule of Works – Land for Community Facilities (Excel - 47.4kb)
    Appendix F - Extract from 'Land value estimate for Brisbane City Council Local Government Infrastructure Plan' (Word - 965kb) No change
  Planning Assumptions Planning Assumptions Extrinsic Material (Word - 240kb) Planning Assumptions Extrinsic Material (Word - 170.6kb)
  Schedule of Works Model Schedule of Works Model Extrinsic Material (Word - 157kb) Schedule of Works Model Extrinsic Material (Word - 73.4kb)

​​Major amendment to planning scheme policies

Part/Schedule Section/sub-section Public Consultation Document  Revised Draft Document
Schedule 6

SC6.16 Infrastructure design planning scheme policy

Chapter 2 Transport Network

Schedule 6 (Word - 3.44Mb)

No change

Find out if your property is affected

You can check if there are any proposed future trunk infrastructure items affecting a property by viewing the revised Plans for trunk infrastructure (PFTI) maps for each infrastructure network and the new Schedule of works tables.

Step 1. Check the Plans for Trunk Infrastructure (PFTI) maps for any future trunk infrastructure items.

Step 2. Take note of the unique identifier (e.g. ROC-A1-001) and type of infrastructure (e.g. Park).

Step 3. Open the corresponding Schedule of Works (SoW) table (e.g. SoW Public Parks) and search for the unique identifier (e.g. ROC-A1-001) for more details on the item, such as timing and costings.

To help with interpreting the documents, you can view the key components of the LGIP (Word - 108kb).

If you require assistance viewing or interpreting any information related to the draft LGIP, you can phone the Infrastructure Coordination team on 07 3403 8888.

Note: the final location of trunk infrastructure is subject to detailed investigation, design and Council approval. Delivery of items may be undertaken by Council or through the development process.

LGIP project milestones

The proposed amendment package is following the LGIP statutory process outlined in the Queensland Government’s Statutory guideline 01/16 Making and amending local planning instruments under the Sustainable Planning Act 2009.

10 May 2016 Council proposed to make an LGIP
23 September 2016

Compliance statement received by an independent reviewer

6 December 2016 Council endorsement of the draft LGIP for review by the Queensland Government
5 May 2016 Queensland Government approval to proceed to public consultation
12 June - 21 July 2017

Public consultation on the draft LGIP

28 November 2017 Council considered all submissions and endorsed the revised draft LGIP for review by the Queensland Government
5 December 2017

Compliance statement received by an independent reviewer

To view Council and the Appointed Reviewer's responses to the checklist items (as part of Appendix D of Statutory Guideline 03/14 - Local government infrastructure plans) download the:

Late 2017-early 2018 Final review by the Queensland Government
Early-mid 2018 Anticipated Council adoption and gazettal of the final LGIP

Other City Plan amendments

You may be interested to find out about other proposed amendments to Brisbane City Plan 2014 including the major amendment for long term infrastructure. Find out more.

Register for updates

If you would like to keep up to date on the draft LGIP and major amendment for long term infrastructure, you can register for email updates.

More information

For more information, you can:

  • email the project team
  • phone Council on 07 3403 8888
  • write to:
    Infrastructure Coordination (LGIP)
    City Planning and Economic Development
    GPO Box 1434
    Brisbane Qld 4001.