Tallowwood Place pedestrian bridge replacement - Bridgeman Downs

Brisbane City Council is pleased to announce the replacement of the Tallowwood Place pedestrian bridge in Bridgeman Downs.

The pedestrian bridge is located in Bridgeman Downs and connects Bangalow Street and Karri Place.

Summary

This table provides summary information about the Tallowwood Place pedestrian bridge replacement including address, ward, project outcomes and latest update.
Address Bangalow Street, Bridgeman Downs
Ward McDowall Ward
Project outcomes Improve safety, accessibility and lifespan of the bridge
Latest update

Start of construction

Download the:

About the project

The bridge provides an important link across Cabbage Tree Creek between Coolabah Crescent Park and Jim Wilding Reserve and forms part of a secondary cycle route.

The existing timber bridge was built in 1998, and is nearing the end of its serviceable lifespan. In order to maintain a safe crossing, the bridge will be replaced with a new steel bridge with a concrete deck.

The project will include:

  • installing and removing a temporary bridge
  • replacing the existing timber bridge with a new 3.1 metre-wide steel bridge with a concrete deck
  • piling foundations for the new bridge
  • upgrading the footpath approaches at either end of the bridge
  • embankment protection works
  • landscaping and re-vegetation of disturbed areas.

In order to complete the works, Council has identified some tree trimming that needs to be undertaken. All tree trimming will be undertaken in consultation with a qualified arborist. Council is committed to minimising any impact on the environment and where the removal of trees or vegetation is required, it will be offset in accordance with Council’s offset planting policy.

Construction will generally take place between 7am and 5pm, Monday to Saturday. Council is committed to keeping local residents informed and will provide advanced notification to the community for any out-of-hours works. 

Local residents and businesses in close proximity to the site may experience some construction impacts associated with these works, including noise, dust, vibration, odour, lane closures and some traffic delays. Due to workplace health and safety requirements reversing beepers cannot be switched off.

During construction, access via the existing pathway and bridge will be closed to ensure the safety of pedestrians, cyclists and project workers. Due to the high volume of pedestrians and cyclists a temporary bridge will be installed for the duration of the works, this bridge will be located north of the existing bridge, detour signage will be in place to direct users.

Project timings

Construction will commence in mid-July 2020 and is anticipated to be completed in November 2020, weather permitting.

Project benefits

The bridge replacement will improve the safety, accessibility and lifespan of the crossing.

More information

If you would like to provide comments, ask questions or find out more about the Tallowwood Place bridge replacement project, you can:

  • phone the project team on 1800 884 681 during business hours
  • phone Council on 07 3403 8888 outside business hours
  • email the project team 
  • write to:
    Tallowwood Place bridge replacement project
    City Projects
    Brisbane City Council
    GPO Box 1434
    Brisbane Qld 4001.
Last updated: 1 July 2020