Commuter bikeway corridor studies

The CBD to Wynnum/Manly and CBD to Carindale commuter bikeway corridor studies are part of Lord Mayor Graham Quirk's commitment to provide $120 million in new bikeway infrastructure over four years under the Better Bikeways 4 Brisbane program. These projects will form part of a network to provide for the journey to work, and are part of a long-term initiative to fill major gaps in Brisbane's commuter cycling network.

Summary

Address CBD to Wynnum/Manly
CBD to Carindale
Ward Central, The Gabba, Morningside, Holland Park, Chandler, Doboy, Wynnum Manly
Project outcome To provide a safe and direct through-route with the option of connecting into local destinations and points of interest
Latest update

Preferred alignments for both corridors have been released

Some documents on this page need Adobe Reader, Microsoft Word or Microsoft Word Viewer installed on your computer to view or print them. Some documents may also have a large file size and could take some time to download.

Download the: 

About the projects

In 2012 Lord Mayor Graham Quirk announced $120 million in funding for the Better Bikeways 4 Brisbane (BB4B). This four year program aims to create a better commuter network of bikeways that service major employment areas, as well as improving access and safe travel to local shopping strips, schools and public transport hubs.

BB4B will address the following key priorities outlined in the Brisbane Active Transport Strategy 2012–2026 (Word)

  1. Encouraging walking and cycling
  2. Walking and cycling friendly suburbs
  3. A connected commuter network
  4. A safe and accessible network
  5. Information at your fingertips

The CBD to Wynnum/Manly and CBD to Carindale commuter bikeway corridors are the first two projects to be undertaken as part of priority area three.

Current status

The project team have undertaken technical investigations and consultation with local bicycle user groups to determine preferred alignments for both projects.

Next steps

Council will now undertake further technical investigations to start prioritising areas and scheduling individual bikeway projects within the preferred alignments. These bikeway projects will be rolled out progressively over the coming years.

Council will undertake more detailed consultation with affected residents and businesses throughout the design stages of these individual projects.

More information

If you would like to provide comments, ask questions or find out more about the CBD to Wynnum/Manly and CBD to Carindale commuter bikeway corridors, you can:

  • phone the project team on 1800 884 681
  • phone Council on 07 3403 8888
  • email the project team
  • write to:
    CBD Wynnum/Manly CBD and Carindale commuter corridors
    City Projects
    Brisbane City Council
    GPO Box 1434
    Brisbane Qld 4001

Cycling Brisbane

With more than 1,100 kilometres of bikeways and shared pathways and great bike-related events and facilities, Brisbane has some of the best cycle facilities in the country. Sign up for free to Cycling Brisbane to receive exclusive deals and discounts, project updates and much more.

10 April 2018