The Wynnum Road corridor is an important route in Brisbane’s road network. The corridor provides access between suburban and commercial catchments in Brisbane's eastern suburbs, the Central Business District and beyond.

Council is delivering the upgrade to the Wynnum Road corridor in stages. Stage 1b of the corridor upgrade will complement the works undertaken as part of Stage 1. Council is implementing interim measures to improve traffic efficiency and safety along Wynnum Road, between Canning Bridge and Riding Road.

Stage 1 of the upgrade is from Latrobe Street to Canning Bridge and will see this section of Lytton Road widened to six lanes.

Council will consider further upgrades between Canning Bridge and Riding Road as planning along the Wynnum Road corridor progresses. However, the scope and timing of any future stages has yet to be confirmed.

Wynnum Road corridor upgrade Stage 1b fly-through video

Watch the fly-through video to learn more about this stage of the project.

You can also watch the video and other related videos on Council's YouTube channel.

Read supporting information for this video.

Project summary

Address Wynnum Road – Canning Bridge to Riding Road (including Balmoral Street), Morningside/Norman Park
Ward Morningside
Project outcome This upgrade will provide interim measures to improve traffic efficiency and safety along the corridor between Canning Bridge and Riding Road.
Latest news

Construction activities commenced in early 2018, starting in the Stage 1 area, and both stages are expected to be completed by early 2020.

You can read the latest project update by downloading the most recent community newsletter for Stage 1 and 1b.

Project features

The Wynnum Road corridor upgrade – Stage 1b involves:

  • upgrading the Norman Avenue intersection, including a U-turn for eastbound traffic to travel westbound 
  • removing unsafe right-turn movements across Wynnum Road at Gillan Street, Norman Crescent and Overend Street
  • rationalising bus stops to reduce impacts on traffic flow 
  • indenting the outbound bus stop at Norman Avenue 
  • extending the existing bus jump lane (7-9am, Monday to Friday) from Bennetts Road to Hipwood Street 
  • improving the existing U-turn facility on Wynnum Road near Kingsbury Street 

Partial land acquisitions for Stage 1b are required from some private properties on the northern side of Wynnum Road. These properties are near the Norman Avenue intersection. Council is liaising with affected property owners in accordance with the Acquisition of Land Act 1967.

Project benefits

When complete, Stage 1b of the project will:

  • provide interim measures to improve traffic efficiency and safety along the corridor
  • support access to surrounding residential areas
  • improve bus travel times and service reliability
  • ensure an efficient bus network and reduce impacts on traffic flow.

Construction update

Construction works in the Stage 1b area will commence in early 2019, weather and site conditions permitting. Planning has commenced on developing the construction program and traffic management plans. These plans will:

  • outline the timing and sequence of the works
  • help manage access for road users pedestrians and cyclists.

Council will provide advance notification of out-of-hours works and major access changes, including disruptions to property access.

Residents and businesses in close proximity may experience construction noise, increased truck movements and low levels of vibration and dust. 

Project documents

You can download the following documents:

More information

For more information about this project: 

  • phone the project team on 1800 572 132 (during business hours)
  • phone Council on 07 3403 8888 (after hours) 
  • email the project team
  • visit the project’s Community Information Centre at:
    89 Lytton Road
    East Brisbane (access via Heidelberg Street)
    open every Tuesday from 10am-12 noon, and
    Wednesday from 2-4pm, or
    other times by appointment
  • write to:
    Wynnum Road corridor upgrade - Stage 1b
    City Projects Office
    Brisbane City Council
    GPO Box 1434
    Brisbane Qld 4001.
07 January 2019