Murarrie Recreation Hub video - supporting information

This page provides supporting information for the Murarrie Recreation Hub fly-through video.

The fly-through video shows the completed Murarrie Recreation Hub, completed in late November 2019.

The video starts by showing project signage attached to a pole, reading “Murarrie Recreation Hub. Construction works from mid-September 2019 to early 2020”.

The video transitions to a full panning shot of the Murarrie Recreation Hub, with the Sir Leo Helscher Bridge visible in the background. It then closes up on the pontoon signage fixed to the gangway, which reads “Murarrie Recreation Hub”.

The video pans back along the gangway to show the shoreline and the Brewdog Brewery in the background.

The next shot shows a zoom in shot of the entire length of the gangway from the shore to the Brisbane River.

The video then pans back along the opposite side of the pontoon with the Queensland Bulk Terminals visible in the background before fading to black.