Proposed citywide amendment - planning scheme policy - Amendment package N

Brisbane is a great place to live, work and relax. To ensure our friendly and liveable city continues to thrive and Brisbane City Plan 2014 (City Plan) remains effective and up-to-date, Brisbane City Council is proposing amendments to some of its citywide provisions with Amendment package N.

Have your say on the proposed amendment by Monday, 9 August 2021.

City Plan includes planning scheme policies to provide further information, guidance and advice to the development industry about how the outcomes prescribed in development codes can be achieved. The Infrastructure design planning scheme policy addresses the delivery of infrastructure that contributes to the liveability of Brisbane residents such as parks, pathways, public utilities, road corridors and public art.

Proposed Amendment package N includes changes to the Infrastructure design planning scheme policy to:

  • improve the safety, amenity and sustainability of our city’s lighting infrastructure
  • ensure proprietary stormwater treatment devices achieve the stormwater quality outcomes of City Plan
  • design, construct, deliver and maintain infrastructure in accordance with industry best practice and Council standards. 

This proposed Amendment package N is following the ‘planning scheme policy amendment’ process as outlined in the Queensland Government’s Minister's Guidelines and Rules.

Proposed changes

The changes proposed to City Plan under Amendment package N are summarised below and include:

  • public lighting
  • stormwater treatment devices
  • Brisbane Standard Drawings and Reference Specifications.

The full details of the proposed amendment can be found on City Plan online.

Public lighting

Changes to public lighting standards are proposed to:

  • improve the safety of public areas throughout Brisbane by delivering appropriate public lighting levels
  • reflect the latest Australian Standards for public lighting, specifically AS/NZS1158.3.1 - Lighting for roads and public spaces
  • provide a common format for public lighting infrastructure requirements to clarify the meaning, improve readability and interpretation of public lighting standards
  • update the Infrastructure design planning scheme policy to reflect industry best practice for the delivery of lighting and other Council infrastructure.

Each chapter of the planning scheme policy addresses the delivery of lighting infrastructure for specific scenarios. The chapters proposed to be changed in the Infrastructure design planning scheme policy are:

  • Chapter 1 Introduction
  • Chapter 3 Road corridor design
  • Chapter 4 Pathways outside of the road corridor
  • Chapter 6 Public art
  • Chapter 9 Public utilities
  • Chapter 10 Parks
  • Chapter 11 Public toilets
  • Chapter 12 Public riverside facilities.

Stormwater treatment devices

Changes to parts of the Infrastructure design planning scheme policy are proposed to ensure proprietary stormwater treatment devices used in a design solution have appropriate certification from the Stormwater Quality Improvement Device Evaluation Process (SQIDEP) and demonstrate the required performance metrics of City Plan.

This change will only affect Chapter 7 Stormwater drainage of the Infrastructure design planning scheme policy.

Brisbane Standard Drawings and Reference Specifications

Changes are proposed to Brisbane Standard Drawings and Reference Specifications. These changes include:

  • amendments to existing Brisbane Standard Drawings and Reference Specifications
  • addition of new Brisbane Standard Drawings and Reference Specifications
  • removal of redundant Brisbane Standard Drawings and Reference Specifications
  • updates to cross references to Brisbane Standard Drawings and Reference Specifications.

The chapters proposed to be changed in the Infrastructure design planning scheme policy include:

  • Chapter 1 Introduction
  • Chapter 3 Road corridor design
  • Chapter 6 Public art
  • Chapter 8 Structures
  • Chapter 10 Parks
  • Chapter 12 Public riverside facilities.

View the proposed new and updated Brisbane Standard Drawings and Reference Specifications:

1000 series - General

This category contains miscellaneous standard drawings.

Select a document

2000 series - Road corridor

This category contains standard drawings for vehicle crossings, trench restoration, traffic islands, bus bays/stops/shelters and retaining walls.

Select a document

3000 series - Traffic management

This category contains standard drawings for manoeuvring areas, turning templates, parking regulation signs, pavement marking, roundabouts and intersections.

Select a document

4000 series - Traffic signals and intelligent transport systems

This category contains standard drawings for traffic signals and intelligent transport systems.

Select a document

5000 series - Pedestrian and cyclist facilities

This category includes standard drawings for pedestrian and cyclist facilities.

Select a document

7000 series - Fences, barriers and public furniture

This category contains standard drawings for fences, noise barriers, entrance barriers, vehicle access and seating.

Select a document

8000 series - Stormwater drainage and water quality

This category contains standard drawings for stormwater drainage and water quality.

Select a document

10,000 series - Park and natural area facilities

This category includes standard drawings for all park infrastructure, facilities and landscaping.

Select a document

11,000 series - Electrical facilities and installations

This category includes standard drawings for park and pedestrian lighting requirements.

Select a document

Reference specifications

Select a document

How to have your say

Now is the time to have your say about the proposed changes. Written submissions are open now until 11:59pm, Monday 9 August 2021.

Download a copy of the public notice:

Before having your say, you should view the proposed changes in City Plan online.

To be formally considered by Council, submissions must be properly made.

A properly made submission must:

  • be in writing
  • state what you support or do not support in the proposed package and why
  • include the name and address of each person who is listed as supporting the submission
  • include the signature of each person (when sending by post)
  • include your phone number and/or email address if you are happy for Council to contact you for further information.

Submissions can be sent to Council by the following methods:

  • make a submission in City Plan online. Click the ‘submissions’ button on the homepage to begin. For guidance on how to use City Plan online, please refer to the supporting information
  • email the project team
  • write to:
    Strategic Planning
    City Planning and Economic Development
    Brisbane City Council
    GPO Box 1434
    Brisbane QLD 4001.

Following the submission review period, Council will write to everyone who has made a properly made submission on the proposed changes and will publish a copy of the consultation report online.

Talk to a Planner sessions

If you would like to talk to a Council planner about the proposed amendment, you can book an appointment to talk to a planner at one of our upcoming information sessions.

Please note that sessions are informal and there will not be a presentation by Council at the session. Bookings are required. Please select a session below to make a booking. 

Timeline

Table of project milestones

Early-mid 2021

Preparation and drafting of amendment package

1 June 2021

Council proposed to amend City Plan

12 July – 9 August 2021 

Public consultation including an opportunity to have your say on the proposed changes

Late 2021

Council adoption and gazettal

Other City Plan amendments

You may be interested to view details on other proposed amendments to City Plan.

Register for updates

To stay informed about City Plan, including proposed amendments and to receive other Council planning and building updates, you can register for email updates

More information

For more information about the proposed amendment you can:

  • email the project team
  • phone Council on 07 3403 8888
  • write to:
    Strategic Planning
    City Planning and Economic Development
    Brisbane City Council
    GPO Box 1434
    Brisbane Qld 4001.
Last updated: 12 July 2021