We are pleased to announce that the upgrade to Johnson Road, between the Centenary Highway overpass and Woogaroo Street, in Forest Lake, is now complete. This upgrade was delivered as part of the Australian Government’s 2023-24 Black Spot Program.

Summary

AddressJohnson Road, Forest Lake
WardForest Lake
Project outcomesImproved safety for all road users
Latest news

End of construction

Download the project plan: 

About the project

The Australian Government Black Spot Program is part of the National Road Safety Strategy, which aims to improve road safety and reduce the risk of crashes, by implementing upgrade measures at each black spot location.

This section of Johnson Road was identified as a location requiring safety improvements with three reported crashes between 2016 and 2023, resulting in two fatalities and one minor injury.

This upgrade has improved safety for motorists along this stretch of road by improving sightlines, increasing driver awareness and encouraging speed reduction at the curve on Johnson Road.

The Johnson Road black spot project was fully funded by the Australian Government through the 2023-24 Black Spot Program.

Project benefits

  • Enhanced safety for motorists by installing signage, guideposts and guardrail to encourage speed reduction at the curve on Johnson Road, west of Woogaroo Street.
  • Improved visibility for motorists by clearing vegetation along the inside curve of Johnson Road to increase sight distance.
  • Improved driver awareness for westbound travel at the downhill gradient by installing signage.

Project details

Below is a summary of the project works.

  • Installed new driver awareness signage, including directional hazard and curve warning signs, at the curve in Johnson Road.
  • Installed guideposts and guardrails on the northern side of the road.
  • Relocated existing signage on the southern side of the road.
  • Cleared vegetation on the southern side of the road near the curve.

Project timing

  • Project introduction – early July 2023.
  • Start of construction – late July 2023.
  • End of construction – late August 2023.

More Information

If you have any questions about the Johnson Road black spot project, you can:

  • call the project team on 1800 669 416 (during business hours)
  • call Council on 07 3403 8888 (after hours)
  • email the project team
  • write to: 
    Johnson Road black spot project
    City Projects Office
    Brisbane City Council
    GPO Box 1434
Last updated:

Brisbane City Council acknowledges this Country and its Traditional Custodians. We pay our respects to the Elders, those who have passed into the dreaming; those here today; those of tomorrow.